The operating rate is both expected to reduce further in short run in terms of supply and demand side
Home » News » The operating rate is both expected to reduce further in short run in terms of supply and demand side

The operating rate is both expected to reduce further in short run in terms of supply and demand side

Views: 1     Author: Site Editor     Publish Time: 2022-08-31      Origin: Site

Inquire

Based on current estimate, the orderly electricity consumption will not last long, mainly 1-7 days. DTY market will be affected the most, followed by fabric manufacturing market and chip-spun field, and the polymerization sector will be the least impacted. The influence on demand side will be bigger than that on supply. However, some factories have not started controlling run rate by now although they have received notice. The operating rate is both expected to reduce further in short run in terms of supply and demand side

Quick Links

Products

Information
+86-139-2121-8730
512 Taihu Pearl Development Mansion,1890 Taihuixi Road, 214072, Wuxi, Jiangsu,China
Contact us
Copyrights 2024 WUXI LONGSHINE TEXTILE CO., LTD.All rights reserved. Sitemap Alibaba